|
The concept of using a pile system in any construction has been widely tested and proven as an effective flooring support system.
By utilising the precast compacted concrete disk, with additional connection to the pile BEFORE it is placed in the ground, the requirement to have the pile supported is meet, as difined in NZS 3604;1999 - 6.4.5 & NZS 3604:2011- 6.4.5 and enables the construction to continue without cost and time delay, [ NZS 3604;1999 - 6.4.5.6 ] [ NZS 3604:2011- 6.4.5.7].
Conqra's [ Ezi Yaka ] unique relationships with industry leading engineers, building officials, contractors, builders merchants throughout New Zealand allows Conqra to offer national coverage for their Pre-cast concret footing and flooring systems.
Conqra's [ Ezi Yaka ] Lightfoot pier system can be easily be intergrated with all other flooring systems, mounted onto cut and filled sites, in block bases or Polyrock infills and with Conqra Bigfoot piers and can be used in expansive clays. Other options include driven piles and concrete piers.
* Time and Labour Cost effective * Simple and quick to implement. * Strong and secure. * Reduces spoil. * Patented designs.
|